This project was Design-Bid-Build and was performed for the Padre Dam Municipal Water District, Santee California. R. A. Burch was a joint venture partner with RABC-ECC, JV who was the prime contractor for this project. The general scope of work involved improving existing substandard operation yard conditions, including an overall site modernization with emphasis on C.B.C. Accessibility standards for site improvements. The work included grading and storm water runoff to accommodate the floodplain requirement, with the use of pervious and impervious systems to allocate proper water discharge throughout the site; hydraulic site analysis; site reconfiguration and the addition of a new pre-fabricated metal building.